2020 Yakima Reliabilty Project - Transmission Work

Client: Pacificorp

Locations:

  • Walla Walla, WA
  • Coos Bay, OR
  • Yakima, WA

Completion:

  • Walla Walla RFX 4526:  June 2020
  • Walla Walla:  June 2020
  • BO Cross Arm:  July 2020
  • Coos Bay OR:  Ongoing
  • Yakima Priority Trans Pole:  Jan. 2021
  • Yakima Priority Trans Pole:  Dec. 2020

Scope/Description:

  • Replacing two 69KV transmission structures.
  • Cascade Kraft 69kV line and 230 kV arrester replacement.
  • Replacing spare arms 69KV transmission structures.
  • 115kV Transmission pole change-outs with distribution underbuild.
  • 230kV Bad Oder transmission structure change-out.
  • 115kV Bad Oder transmission structure change-out.