2020 Yakima Reliabilty Project - Underground Work

Client: Pacificorp

Location:

  • Yakima, WA
  • Pendleton, OR
  • Wapato, WA
  • Albany, OR
  • Bend, OR

Completion:

  • Pendleton Pole Replacements:  July 2020
  • Yakima Reliability II:  July 2020
  • Priority A Structure Replacement:  October 2020
  • Yakima Reliability:  November 2020
  • PTE Poles:  December 2020
  • Pendleton Pole Replacements:  December 2020
  • Yakima Reliability and Dist Pole Replacement:  December 2020
  • Yakima Reliability: December 2020
  • Bend Reconductor:  Ongoing
  • Albany Reliability (Multi-Work-order):  Ongoing
  • 2020 Albany B Pole Replacement:  Ongoing

Scope/Description:

  • Pendleton Pole Replacements
  • Yakima Reliability II: Replace cross arms, cutouts/bells, PTE replacement
  • Priority A Structure Replacement: Distribution pole change-outs
  • Yakima Reliability: Replace arms, cut-outs and bells
  • PTE Poles: Distribution pole change-outs
  • Yakima Reliability and Dist Pole Replacement: Consists of 6 WO’s Changing out 45 to 50 distribution poles in Yakima County, WA
  • Yakima Reliability:  Replacing cut-outs, insulators, arms and other various hardware to reduce the outages in the local district.
  • Bend Reconductor: Distribution reconductor that included 3 small three-phase reconductors and 2 neutral extensions.
  • Albany Reliability (Multi-Work-order): Replacing cut-outs, insulators, arms and other various hardware to reduce the outages in the local district.
  • 2020 Albany B Pole Replacement: 200 distribution pole change-outs