Salzer Transmission Line Project
					Client: City of Centralia
Location: Centralia, WA
Completion Date: January 2020
Scope/Description:
- Installation of tubular steel H frame, tubular mono-steel, and wood pole structures
 
- Framing for 115kV, 12.47 kV and overhead shield wire assemblies
 
- Installing down guys, span guys, stub poles & Anchors
 
- Installation of a 115kV disconnect switch
 
- Installing new 115 kV conductor, 12.47 conductor & Overhead shield wire
 
- Removing existing 12.47 conductors, assemblies, apparatus, wood poles, & misc materials
 
- Transferring &reconnecting existing distribution services, transformers lights etc to the new poles