Salzer Transmission Line Project

Client: City of Centralia

Location: Centralia, WA

Completion Date: January 2020

Scope/Description:

  • Installation of tubular steel H frame, tubular mono-steel, and wood pole structures
  • Framing for 115kV, 12.47 kV and overhead shield wire assemblies
  • Installing down guys, span guys, stub poles & Anchors
  • Installation of a 115kV disconnect switch
  • Installing new 115 kV conductor, 12.47 conductor & Overhead shield wire
  • Removing existing 12.47 conductors, assemblies, apparatus, wood poles, & misc materials
  • Transferring &reconnecting existing distribution services, transformers lights etc to the new poles